serbia artsuveniri
0
✓ Free delivery on orders over 5.000 RSD
Expo 2027 Belgrade · 15 May – 15 August 2027

Custom furniture for Expo 2027 pavilions

Short answer

We organise the production of custom furniture for Expo 2027 pavilions: reception and information desks, VIP lounge seating, meeting tables, shelving and display furniture, café and restaurant furniture and back-office furniture. Furniture is made to your design and materials by vetted manufacturers, with a sample of key pieces before the series, inspection before shipping and delivery to the Expo site in Belgrade.

Key facts

  • Expo 2027 Belgrade runs from 15 May to 15 August 2027.
  • Custom pieces: reception desks, lounge seating, tables, shelving, bar counters, office furniture.
  • Main Chinese furniture centres: Foshan and Dongguan (Guangdong); premium and contract (hotel) furniture is made there for export.
  • From China: usually 4–8 weeks of production after sample approval plus 30–60 days by sea.

Furniture for every zone of the pavilion

  • Entrance and reception: reception and information desks, queue furniture.
  • Exhibition: shelving, plinths, display tables and cabinets.
  • VIP lounge and meeting rooms: sofas, armchairs, coffee and meeting tables.
  • Café, restaurant and bar: tables, chairs, bar stools, counters.
  • Back office and staff areas: desks, storage, lockers.

Materials and finishes

  • Solid wood and veneer, lacquered and matt surfaces in RAL colours or to a sample.
  • Upholstery with fabrics or leather of your choice, with flammability testing when the project requires it.
  • Stone and sintered stone tops; metal details in brass, stainless steel or coloured aluminium.
  • Furniture designed for transport and re-assembly, so it can be reused after Expo.

From drawing to delivery

  • Drawings and specification from your architect or designer.
  • Offers from vetted manufacturers and a sample of key pieces.
  • Production follow-up and inspection before loading.
  • Consolidated delivery with the rest of your interior, by installation phase.

Send us what you need, quantities and your deadline. We reply within 24 hours on working days.

Request an offer →

Frequently asked questions

Can you make furniture to our pavilion's design?

Yes. Manufacturers work from your architect's or designer's drawings — dimensions, materials, colours and hardware by specification — with a sample of key pieces for approval before the series.

Where is the furniture produced?

Depending on the deadline, quantity and budget: in vetted factories in China (mostly Foshan and Dongguan) or with manufacturers closer to Belgrade. We propose the option that fits your schedule.

How long does custom furniture take for Expo 2027?

From China usually 4–8 weeks of production after the sample is approved plus 30–60 days by sea and transport to Belgrade, so drawings should be final early in 2027.

What happens to the furniture after Expo?

It can be reused in your embassy, offices or next exhibition, or sold. If you tell us at the start, we design the furniture for dismantling and transport.

More Expo 2027 services

Serbia Art is an independent company and is not affiliated with the official organiser of Expo 2027 Belgrade.